Reconstruction of Petroleum Products Jetties, Apapa
Reconstruction of Petroleum Products Jetties, Apapa
The old 3No. Finger Jetties were built in 1955 and were no longer serviceable. The Project was to reconstruct the 3No. Jetties to take a maximum design ship of 35,000 DWT. The jetties were to be fitted with Loading arms. The complex comprises the 3No. Jetties (PWA, NOJ and BOP), Auxiliary Buildings (NNPC Control Room, Marketers Buildings, Fire Fighting House and Pump House). The Jetties and Buildings are serviced by 1.0km 7.3m wide carriageways.
Client
Nigerian National Petroleum Corporation.
Project Location
End of Alapata Road, Apapa, Lagos.
Project Type
Design of Engineering Infrastructure
Professions of Staff Deployed
Engineers, Technical Officers, and Technicians
Number of Staff
12
Services Provided
The project is an EPC (Engineering Procurement Construction) Contract and our duties were:
· To serve as the leading consultants on the project
· To serve as the Civil/Structural/Marine Consultants
· To provide frontline engineering design
· To check the detailed engineering design as done by the contractor
· To approve the design, if adequate, for construction
To supervise the Contract Works during execution
Duration
1994-11-01 - 2000-03-31
Project Cost
USD 1.35million
Project Status
General Progress